Search

78 Springs Road

Current Developments

Overview

This property is a 10.4-hectare high-profile corner site with extensive road frontages to Springs Road and Kerwyn Avenue. Conveniently located near the southern motorway and public transport links, it is ideal for transport, logistics and staff commuting. The development is being carried out in three stages. Stage 1, now completed, features a pre-leased, custom-built 25,500 sqm warehouse for Fisher & Paykel. Stage 2 is set to commence in December 2024, with approximately 6,500 sqm of warehouse already pre-leased to MiTek. PFI is currently accepting expressions of interest for the remainder of stage 2 and stage 3. The new builds will offer flexible configurations for various warehouse needs and will feature best in class sustainable facilities.

Gallery

Features

Zoning
Located in heavy industry zoning
Access Points
Dedicated one way drive-through access for loading / unloading
Vehicle movements
High separation between heavy and light vehicle movements
High-profile site
High profile, prominent corner site in the prime industrial precinct of East Tamaki
Motorway access
Excellent access to the Southern Motorway
Public Transport
Good public transport links with bus stop directly in front of property

Sustainability

Targeted 5-Green Star design
Waste Diversion
Diversion of construction and demolition waste from landfill
Materials
Sustainable construction materials
Rainwater harvesting
Utilising rainwater harvesting for the project
Solar panels
Use of solar panels to generate power on-site
Power metering
Tracking usage of power for efficiency
EV charging stations
Industry-standard EV charging stations allowing for affordable commuting
Greenhouse Emissions
Greenhouse Gas emissions performance settings

Location

78 Springs Road, East Tāmaki, Auckland, New Zealand
Upcoming Developments

Spanning 6 hectares of prime greenfield land in Auckland’s North West, this property is tailored for light industry development with flexible warehouse options and custom Design & Build packages. Featuring high stud warehouses and aiming for a 5 Green Star rating, it’s an excellent choice for businesses seeking sustainable, modern facilities. Stage 1 is expected to complete between Q4 2026 and Q1 2027.
01
/ 01